Practical Advice for Meeting the FCC's DFS Testing Requirements
by Juan Martinez and Tom Wetzel

Author's Note: The intent of this article is to share some practical advice on how to achieve compliance with the FCC's new dynamic frequency selection (DFS) requirements. However, in order to provide some general background information on this subject, the article begins with an excerpt from the article "Dynamic Frequency Selection and the 5 GHz Band," written by our colleague Mark Briggs and originally published in Conformity in December 2005.

The advent of the 802.11a wireless market and the constant push to open up new spectrum for unlicensed use created a requirement for dynamic frequency selection (DFS), a mechanism to allow unlicensed devices to share spectrum with existing radar sys­tems. The regulatory requirements for DFS, along with requirements for transmit power control (TPC) and uniform channel loading have been adopted in the United States, Europe and Japan and are being considered by many other regulatory domains looking at adopting the 5GHz bands for unlicensed (and possibly licensed) devices.

Some Background on DFS Requirements in the United States

The Federal Communications Commission (FCC) had already opened up the 5150 - 5350 MHz band when it adopted the UNII rules into Part 15. The FCC opened up the 5470 - 5725 MHz band by working with industry and the Department of Defense through the U.S. Department of Commerce, National Telecommunications and Information Administration (NTIA), and released its Report and Order FCC 03-287 [3]. To release the 5470 - 5725 MHz, a re­quirement for DFS was proposed to cover the new band and the existing 5250 - 5350 MHz band. The timing and threshold requirements were identical to those of EN 301 893 v1.2.3, but the signal parameters were different and included a frequency hopping radar.

Click here to read the rest of this article.


WaveZero to Present EMI Shielding Workshop at Elliott Labs

WaveZero, a leading provider of innovative EMI shielding solutions, will present a lunchtime workshop at Elliott Laboratories Sunnyvale, CA facility on November 15, 2007 from 11:30am-1:00pm. This EMI Shielding Workshop will explore how designers and engineers can use vacuum metalized plastic enclosures and PCB shields in their products. John Zarganis, VP Industrial Solutions for WaveZero, will deliver this presentation. Lunch will be served and there is no cost to attend but seating is limited and made available on a first-come first-served basis.

Please RSVP to info@elliottlabs.com if you would like to attend and we will provide confirmation of your reservation. We hope you enjoy this free event!

Practical Advice for Meeting the FCC's DFS Testing Requirements
What's New at Elliott
Elliott is Hiring!

Elliott is currently searching for talented individuals to join our team.
Please click here to see a list of current openings.


Elliott launches New Corporate Website!

Elliott Laboratories is proud to announce the launch of its new corporate website. The new site has been in the works for several months and was implemented to provide our clients with an informative and user-friendly storefront to our services.

To take a tour of our new website, please click here.


684 W. Maude Avenue
Sunnyvale, California 94085
www.elliottlabs.com

Unsubscribe or update your email preferences by selecting this link.
Email Marketing
684 W. Maude Avenue | Sunnyvale, CA 94085